IMPROVEMENTS COMPLETED FOR THE TOILETS OF MASJID MATAR
The 4-door toilets near the Masjid was also in a dilapidated state. The doors were damaged, toilet bowls were clogged, there was no water nearby, the roofs were damaged, old and leaking, the walls were dark and gloomy, and the floors were dirty and slippery.
The repair of the toilets was completed on the 1st week of February 2024 and it included:
1) new doors were installed
2) new toilet bowls were installed
3) water supply is installed
4) roofs are raised and replaced
5) walls are painted
6) floors are tiled
Pictures below show the "before" and "after" improvement of the toilets.
1) Before improvements
2) After Improvement




















Comments
Post a Comment